  • 0

Diesel – House of Fraser, Roll Out

044_opt                                                                                         049_opt 050_opt            Roll out of 15 shop in shops in House of Fraser, throughout the UK.

The works involved:-

* The creation of shop in shop in retail space.

* The installation of wall bays, display units and bespoke shopfittings.

* New electrical services throughout including new lighting and illuminated logos.

* Complete decoration throughout

* All works were delivered to the strict House of Fraser guidelines

 


  • 0

Tommy Hilfiger – The Bullring, Birmingham

Refurbishment works undertaken over 2 weeks.  The store remained open with the Fit Out Team working nights ensuring that the store was ready the following morning for trading.

The works comprised of a complete redecoration, works to the window beds, wall bays repositioned and new fixtures and fittings. The lighting was replaced with a perimeter lighting track, recessed spotlights and chandelier.  Original oak paraquet flooring was treated and restored back to its light oak.

A clean, contemporary look was created replacing the existing dark walls and flooring

Works to the back area were also carried out refurbishing the staff room and stock room.

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

 

 

 


  • 0

DAY – Liberty, London

New Look (UK) Limited completed the fit out works for DAY at the most iconic department store, Liberty, London.

The works involved:-

  • The creation of shop in shop in retail space.
  • The installation of wall bays, display units and bespoke shopfittings.
  • New electrical services throughout including new lighting.
  • Complete decoration throughout
  • All works were delivered to the strict Liberty guidelines.

  • 0

Tommy Hilfiger – House of Fraser, Roll Out

 

We have been working with Tommy Hilfiger for over 10 years and continue their roll out of shop in shops in House of Fraser, throughout the UK.

The works involved:-

* The creation of shop in shop in retail space.

* The installation of wall bays, display units and bespoke shopfittings.

* New electrical services throughout including new lighting and illuminated logos.

* Complete decoration throughout

* All works were delivered to the strict House of Fraser guidelines

040_opt033_opt 039_opt


  • 0

Calvin Klein – Regent Street, London

The refurbishment of the ground floor of Calvin Klein’s flagship store.  The works involved alterations to walls, painting and decorating, new lighting, the manufacture of podiums for display in store and window beds plus the introduction of all the latest fixtures and fittings.

The works was completed in a short time frame of 5 days


  • 0

Tommy Hilfiger – Harrods, Knightsbridge

New Look (UK) Limited completed the works for Tommy Hilfiger Menswear at the most prestigious department store, Harrods, London.

The works involved:-

* The creation of the retail space and fitting rooms.

* The installation of wall bays, display units and bespoke fixtures.

* New electrical services throughout including new lighting.

* Complete decoration throughout

* All works were delivered to the strict Harrods guidelines.